Week of 6/9 (Last Week)
This week I just did some small cleaning projects and got ready for the end of the year. I copied a lot of my project files into personal...
lincolndbell9
Jun 121 min read
Â
Â
Â


Weeks of 5/26 and 6/2
This week (6/2) I worked on making a small wooden music box for fun. The box plays a few notes when a button is pressed. This is the CAD...
lincolndbell9
Jun 53 min read
Â
Â
Â


week of 5/19
This week I worked on a small project, making a wood/acrylic Go board, which is a board game slightly similar to checkers. I started with...
lincolndbell9
May 221 min read
Â
Â
Â


week of 5/12
This week I was waiting for a new collet I ordered to arrive in the mail, so I spent most of the week doing cleaning jobs around the shop...
lincolndbell9
May 191 min read
Â
Â
Â


5/5
This week I tested a few different ways to fix the problems that I've been having with my balancing rig. I also finally got to do a full...
lincolndbell9
May 82 min read
Â
Â
Â


Week of 4/28/25
I didn't do much work on my code this week, but I thought I would make a post explaining my code in detail now that I'm getting closer to...
lincolndbell9
May 14 min read
Â
Â
Â


Week of 4/7/25
I spent this week testing my newly assembled balancing rig. I started by transferring all the code and circuits from my PD testing ramp,...
lincolndbell9
Apr 111 min read
Â
Â
Â


Week of 3/31/25
This week I focused on some small tweaks and design changes for my balancing rig before I start assembling everything. First, I had to...
lincolndbell9
Apr 32 min read
Â
Â
Â


Week of 3/24/25
This week I continued assembling the design I had made the week prior. The old motor pins I was using snapped off inside the gimbals,...
lincolndbell9
Mar 281 min read
Â
Â
Â


Week of 3/17/25
This week I moved on from my PD control tester and started taking the code that I had made and applying it to my monorail. I started by...
lincolndbell9
Mar 211 min read
Â
Â
Â


Week of 3/3
This week I continued trying to get my PID balance ramp to work. Originally, I was trying to use a quadratic equation to control my...
lincolndbell9
Mar 61 min read
Â
Â
Â


week of 2/24
This week I worked on a motor driven ramp to test PID loops, so I know how to use them when I implement them into my monorail. I followed...
lincolndbell9
Mar 31 min read
Â
Â
Â


week of 2/10
This week I spent working on a PID controller that I could implement into a testing rig. The rig balances a ball rolling along a track....
lincolndbell9
Feb 141 min read
Â
Â
Â


Week of 2/4
This week I spent testing out my new socket for my flywheels, which I 3d printed. The socket had 3 holes where the mounting screws will...
lincolndbell9
Feb 71 min read
Â
Â
Â


Week of 1/27
I spent the better part of this week doing research on a feedback loop for my monorail, as I've realized in the past few weeks that...
lincolndbell9
Jan 303 min read
Â
Â
Â


Week of 1/21/24
Last week, I was testing the new motor mounts by stacking both of my flywheels on one motor and testing the mounts with them. This worked...
lincolndbell9
Jan 232 min read
Â
Â
Â


week of 1/6
This week I made a lot of progress on my flywheel design, because I found out that the motors I have actually came with mounts to attach...
lincolndbell9
Jan 91 min read
Â
Â
Â


week of 12/8
The first part of this week I spent trying to balance my gyroscopes, as the imperfections in my machining was causing a lot of vibration,...
lincolndbell9
Dec 12, 20241 min read
Â
Â
Â


Week of 12/3
I spent this week machining aluminum flywheels to use on my gyroscopes, because the Acrylic ones I've been using aren't heavy enough to...
lincolndbell9
Dec 5, 20241 min read
Â
Â
Â


Week of 11/13/24
This week I continued making new iterations of the balancing rig, and finally got the measurements right between the bed and the swivels,...